TIBCO ActiveMatrix BPM Installation and Configuration
24
|
Chapter 2 Pre-install Considerations
Some example scenarios that a distributed system can cater to include:
an enterprise whose focus is on straight-through processing and enterprise
integration may want to direct more resources to Process Manager nodes.
a call center-based enterprise may require more Work Manager nodes.
Consider an example where TIBCO ActiveMatrix BPM Nodes A, B, and C are
distributed between three machines, such that:
Node A runs a logical node of type BPM Node.
Node B runs a logical node of type BPM Node.
Node C runs a logical node of type Work Manager.
A distributed configuration requires homogenous software configuration. Each
member of the cluster must use the same TIBCO ActiveMatrix BPM logical node
type.
For more information about TIBCO ActiveMatrix BPM logical nodes, see TIBCO
ActiveMatrix BPM Concepts.